Completed (2022)Ref: R7233-60-2022 Fujairah, UAE
E184 – Yabsa Bypass Road
R7233-60-2022 – Treatment, Protection and Rock Stabilization for Yabsa Bypass Road, Fujairah, UAE (Stage 1)
DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 11 km road corridor in Fujairah, treating cuts up to 125 m high.
Protected Rock Area
115,000 m²
Road Corridor Length
11 km
Project Status
Completed (2022)
Client / Authority
Ministry of Energy and Infrastructure (MOEI)

01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements
Project Highlights
Very high and extensive rock cuts
Works adjacent to live traffic
Complex crane and access requirements
Project Information
Road / Corridor NameE184 – Yabsa Bypass Road
Official Contract NameR7233-60-2022 – Treatment, Protection and Rock Stabilization for Yabsa Bypass Road, Fujairah, UAE (Stage 1)
Contract RefR7233-60-2022
Client / AuthorityMinistry of Energy and Infrastructure (MOEI)
DCC RoleMain Geotechnical Contractor
LocationFujairah, UAE
Status / YearCompleted (2022)
Road Corridor11 km
Protected Rock Area115,000 m²