Completed (2020)Ref: Packages 1, 2 & 3 Dubai to Hatta, UAE
E64 – Al Watan Road
Construction of the road between Wadi Al Ghor and the link road between Al Hibab Roundabout and Nazwa Road – Packages 1, 2 & 3
DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 45 km road corridor (Packages 1, 2 & 3).
Protected Rock Area
135,000 m²
Road Corridor Length
45 km
Project Status
Completed (2020)
Client / Authority
Ministry of Presidential Affairs

01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements
Project Highlights
More than 50 stabilized rock cuts
High mountain cuts up to 120 m
Multiple highway packages delivered
Project Information
Road / Corridor NameE64 – Al Watan Road
Official Contract NameConstruction of the road between Wadi Al Ghor and the link road between Al Hibab Roundabout and Nazwa Road – Packages 1, 2 & 3
Contract RefPackages 1, 2 & 3
Client / AuthorityMinistry of Presidential Affairs
Main ContractorWestern Bainoona Group
DCC RoleSpecialist Geotechnical Subcontractor
LocationDubai to Hatta, UAE
Status / YearCompleted (2020)
Road Corridor45 km
Protected Rock Area135,000 m²