Rock Bolting, Dowels, Anchors and Drainage
Specialist Capability

Rock Bolting, Dowels, Anchors and Drainage

High-capacity rock bolts, post-tensioned cable anchors, and sub-horizontal drainage systems to control internal groundwater pressures.

Rock Bolting, Dowels, Anchors and Drainage
DCC Specialist Operation
Specialist Capability

Service Overview

Targeted reinforcement systems selected to address the governing geological mechanism, access constraints, and long-term performance requirements. Rather than applying a single system across an entire face, we match the reinforcement to the failure mode: local bolting for discrete blocks and wedges, deeper post-tensioned cable anchors where instability is large-scale, and sub-horizontal drainage to relieve groundwater pressure within joints and fractures.

Structural rock reinforcement requires precise alignment with the rock mass discontinuity network. DCC utilizes crawler-mounted drill rigs, crane-suspended drill masts, and pneumatic hand drills to install high-yield passive steel dowels (B500B / threadbar), active resin/cementitious-grouted rock bolts, and multi-strand post-tensioned cable anchors for deep slope equilibrium. Complementary perforated sub-horizontal drainage pipes relieve groundwater pressure within joints and fractures that could otherwise trigger slope instability during rainfall events.

Governing Standards
CIRIA C591 (Rock bolting: a guide to good practice for rock engineering projects), BS EN 1537 (Ground Anchors), BS 8081 (Ground Anchorages), ASTM A615 / A722, PTI DC35.1 (Rock & Ground Anchors)
Primary Engineering Focus
Deep Rock Mass Stabilization, Load Transfer & Groundwater Pressure Dissipation
Engineering Scope

Key Features & Capabilities

1
Fully grouted passive rock dowels, tensioned rock bolts, and anchor bars (25mm–50mm)
2
Multi-strand post-tensioned cable anchors for deep-seated global slope equilibrium
3
Self-drilling hollow-core anchor systems (SDA) for heavily fractured ground formations
4
Sub-horizontal drainage drillholes with slotted PVC casings and geotextile filtration
5
High-pressure thixotropic cementitious grouting for void and joint infilling
6
Comprehensive on-site testing: pull-out verification, proof loading, and lift-off checks
Execution Methodology

Our Delivery Process

01
Phase 01

Percussion Drilling & Logging

Specialist crawler rigs drill designated bolt trajectories, logged by geologists to verify rock strata competence and depth.

02
Phase 02

Anchor Bar / Cable Insertion

High-tensile steel bars or multi-strand cables fitted with centralizers and corrosion protection sleeves are placed.

03
Phase 03

Pressure Grouting & Curing

High-strength non-shrink cementitious grout is pumped under controlled pressure from the bottom up to eliminate air voids.

04
Phase 04

Post-Tensioning & Proof Testing

Calibrated hydraulic jacks apply proof loads up to 150% of design capacity, with full load-extension logging recorded for verification.