Road Leading to Al Suhub Rest Area
Completed (2024)Ref: R-1267 Khorfakkan, UAE

Road Leading to Al Suhub Rest Area

R-1267 – Al Suhub Rest Area, Khorfakkan, UAE

DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 6 km mountain access road corridor in Khorfakkan.

Protected Rock Area
45,000 m²
Road Corridor Length
6 km
Project Status
Completed (2024)
Client / Authority
Sharjah Roads and Transport Authority (SRTA)
Road Leading to Al Suhub Rest Area - Photo 1
01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements

Project Highlights

Active rock bolting & pattern dowels

Anchored high-tensile wire mesh drapery

Rock scaling and slope dressing

Project Information

Road / Corridor NameRoad Leading to Al Suhub Rest Area
Official Contract NameR-1267 – Al Suhub Rest Area, Khorfakkan, UAE
Contract RefR-1267
Client / AuthoritySharjah Roads and Transport Authority (SRTA)
DCC RoleMain Geotechnical Contractor (Direct Contract)
LocationKhorfakkan, UAE
Status / YearCompleted (2024)
Road Corridor6 km
Protected Rock Area45,000 m²