Completed (2024)Ref: Package 2D Sharjah to Fujairah, UAE
Etihad Rail – Package 2D
Etihad Rail – Package 2D (Sharjah to Fujairah)
DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 45 km railway corridor between Sharjah and Fujairah.
Protected Rock Area
60,000 m²
Rail Corridor Length
45 km
Project Status
Completed (2024)
Client / Authority
Etihad Rail

01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements
Project Highlights
Mountain slope works along railway corridor
High-access work with cranes and work platforms
Rock cut stabilization for critical rail infrastructure
Project Information
Road / Corridor NameEtihad Rail – Package 2D
Official Contract NameEtihad Rail – Package 2D (Sharjah to Fujairah)
Contract RefPackage 2D
Client / AuthorityEtihad Rail
Main ContractorCRCC-NPC JV
DCC RoleSpecialist Geotechnical Subcontractor
LocationSharjah to Fujairah, UAE
Status / YearCompleted (2024)
Rail Corridor45 km
Protected Rock Area60,000 m²