Completed (2024)Ref: R7233-60-2022 Khorfakkan, UAE
E199 – Khorfakkan Ring Road
R7233-60-2022 – Treatment, Protection and Rock Stabilization for Federal Roads in Different Areas (Stage 1)
DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 15 km Khorfakkan Ring Road corridor.
Protected Rock Area
50,000 m²
Road Corridor Length
15 km
Project Status
Completed (2024)
Client / Authority
Ministry of Energy and Infrastructure (MOEI)

01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements
Project Highlights
Pattern rock bolting
Anchored wire mesh drapery
Rock scaling and hazardous block removal
Project Information
Road / Corridor NameE199 – Khorfakkan Ring Road
Official Contract NameR7233-60-2022 – Treatment, Protection and Rock Stabilization for Federal Roads in Different Areas (Stage 1)
Contract RefR7233-60-2022
Client / AuthorityMinistry of Energy and Infrastructure (MOEI)
DCC RoleMain Geotechnical Contractor
LocationKhorfakkan, UAE
Status / YearCompleted (2024)
Road Corridor15 km
Protected Rock Area50,000 m²