Jabal Mibrih Road
Completed (2024)Ref: Contract 6/2021 Ras Al Khaimah, UAE

Jabal Mibrih Road

Development of Jabal Mibrih Road

DCC carried out rock-protection and stabilization works at selected cut-slope locations along the 12 km mountain pass road corridor in Ras Al Khaimah.

Protected Rock Area
50,000 m²
Road Corridor Length
12 km
Project Status
Completed (2024)
Client / Authority
Ministry of Energy and Infrastructure (MOEI)
Jabal Mibrih Road - Photo 1
01/05
Corridor Scope Note:Road and rail corridor lengths describe the overall project corridors. DCC’s works were carried out at identified cut-slope locations and do not represent continuous treatment along the full corridor length.
Key Engineering Elements

Project Highlights

Exposed cut faces stabilized along Jabal Mibrih Road

Shotcrete, mesh and rock support works

Delivered in difficult mountain access conditions

Project Information

Road / Corridor NameJabal Mibrih Road
Official Contract NameDevelopment of Jabal Mibrih Road
Contract RefContract 6/2021
Client / AuthorityMinistry of Energy and Infrastructure (MOEI)
DCC RoleMain Geotechnical Contractor (Direct Contract)
LocationRas Al Khaimah, UAE
Status / YearCompleted (2024)
Road Corridor12 km
Protected Rock Area50,000 m²
Discuss a Similar Project

Require a Technical Proposal or Site Assessment?

Let's discuss how our design-and-build rock engineering team can stabilize your site safely.